LTER network Toolik Field Station MBLhome page

Weather at Toolik

Toolik Weather Graphs

Arctic LTER Weather Stations

Toolik Webcam

Animated Gif of yesterday's Webcam

Arctic LTER Inhouse login

Biomass Production and Chemistry 

General Description

Biomass measurements near Toolik Lake, Alaska were first made in 1982. Since then additional measurements have been made, including harvesting several times through the growing season. The harvests have included several different tundra types (heath, wet sedge, acidic and non acidic mesic tussock, shrub), both treated and untreated plots, woody stem biomass, and across several different sites. Per cent carbon nitrogen and phosphorus were also measured for several of the harvests.

Table 1 lists the biomass harvests. It contains the following information for each harvest: date, site and  treatment.

Below is a description of the general method. Exceptions and modifications for a particular harvest are noted in the documentation for that harvest.

Method

Field: Samples are obtained by collecting all aboveground biomass and belowground stems and rhizomes in 20 x 20 cm quadrats, located randomly along line transects within the site. Normally, 4 or 5 quadrats are collected along each of 4 transects at each site or treatment. Aboveground biomass is considered "within" the quadrat if it is associated with a meristem that is within the quadrat. Details are given in Shaver and Chapin (Ecological Monographs, 61(1), 1991, pg. 1.)

Lab: Each quadrat is first sorted into species and then into tissue type. Depending on the harvest, tissue types can be broad categories, i.e. above and below, or more detailed, i.e. inflorescences, new growth, old growth, etc. The separated samples are dried for several days at approximately 65 ºC and then weighed. The dry weight for each quadrat, species and tissue type is recorded. Finally the samples from all quadrats in a transect are combined according to tissue type. Samples are then returned to Woods Hole for nutrient analysis.

Table 1: Biomass Harvests 1982-Present

Date Site Treatment
01-Jun-1982 Atigun Wet Sedge Control
  Toolik Heath Control
  Toolik Shrub Control
  Toolik Tussock 1981 plots Control
31-Jul-1982 Atigun Wet Sedge Control
  Toolik Heath Control
  Toolik Shrub Control
  Toolik Tussock 1981 plots Control
01-Sep-1982 Atigun Wet Sedge Control
  Toolik Tussock 1981 plots Control
21-May-1983 Toolik Tussock 1981 plots Control
    Nitrogen Phosphorus
    Greenhouse
    Greenhouse Nitrogen Phosphorus
    Shade House
14-Jun-1983 Toolik Tussock 1981 plots Control
    Nitrogen Phosphorus
03-Jul-1983 Toolik Tussock 1981 plots Control
    Nitrogen Phosphorus
30-Jul-1983 Toolik Tussock 1981 plots Control
    Nitrogen Phosphorus
    Greenhouse
    Greenhouse Nitrogen Phosphorus
    Shade House
23-Aug-1983 Toolik Tussock 1981 plots Control
    Nitrogen Phosphorus
26-Jul-1984 Toolik Tussock 1981 plots Control
    Nitrogen Phosphorus
31-Jul-1988 Sag Foot Slope (3) Control
  Sag Heath (5) Control
  Sag Hill Slope (4) Control
  Sag Tussock (6) Control
  Sag Wet Sedge (2) Control
  Sag Willow (1) Control
21-Jul-1989 Toolik Tussock 1981 plots Control
    Nitrogen Phosphorus
    Greenhouse
    Greenhouse Nitrogen Phosphorus
    Shade House
27-Jun-1992 LTER Moist Acidic Tussock 15N Control
10-Aug-1992 LTER Moist Acidic Tussock 15N Control
04-Jul-1993 LTER Moist Acidic Tussock 15N Control
31-Jul-1994 LTER Wet Sedge Control
    Nitrogen Phosphorus
    Greenhouse
    Greenhouse Nitrogen Phosphorus
    Shade House
    Nitrogen
    Phosphorus
  Sag Wet Sedge (2) Control
    Nitrogen Phosphorus
    Nitrogen
    Phosphorus
31-Jul-1995 Toolik Tussock 1981 plots Control
    Nitrogen Phosphorus
31-Jul-1996 LTER Heath Control
    Nitrogen Phosphorus
    Shade House
    Nitrogen
    Phosphorus
25-Jul-1997 LTER Acidic snowbed Control
  LTER Acidic Watertrack Control
  LTER Moist Acidic Tussock Control
  LTER Non Acidic snowbed Control
  LTER Non Acidic Tussock Control
  LTER Non Acidic watertrack Control
  Sagwon snowbed Control
  Sagwon Tussock Control
  Sagwon Watertrack Control
25-Jul-1998 LTER Moist Acidic Tussock 15N Control
31-Jul-1999 LTER Moist Acidic Tussock Control Small Fenced
    Control Unfenced
    Nitrogen Phosphorus Unfenced
    Nitrogen Phosphorus Small Fenced
  LTER Non Acidic Tussock Control
24-Jul-2000 LTER Moist Acidic Tussock Control Unfenced
    Nitrogen Phosphorus Unfenced
  LTER Non Acidic Tussock Control
    Nitrogen Phosphorus
    Greenhouse
    Greenhouse Nitrogen Phosphorus
    Nitrogen
    Phosphorus
30-Jul-2000 Toolik Tussock 1981 plots Control
    Nitrogen Phosphorus
23-Jul-2001 LTER Moist Acidic Tussock Control Unfenced
    Nitrogen Phosphorus Unfenced
  LTER Non Acidic Tussock Control
    Nitrogen Phosphorus
27-Jul-2001 LTER Wet Sedge Control
    Nitrogen Phosphorus
    Greenhouse
    Greenhouse Nitrogen Phosphorus
    Shade House
  Sag Wet Sedge (2) Control
    Nitrogen Phosphorus
26-Jul-2002 LTER Moist Acidic Tussock Control
    Control Small Fenced
    Nitrogen Phosphorus
    Greenhouse
    Greenhouse Nitrogen Phosphorus
    Nitrogen Phosphorus Unfenced
    Nitrogen Phosphorus Small Fenced
    Nitrogen Phosphorus unfenced 
24-Jul-2006 LTER Heath Control Small Fenced
    Control Unfenced
    Nitrogen Phosphorus Unfenced
    Nitrogen Phosphorus Small Fenced
  LTER Moist Acidic Tussock Control Small Fenced
    Control Unfenced
    Nitrogen Phosphorus Unfenced
    Nitrogen Phosphorus Small Fenced

Please contact arc_im@mbl.edu with questions, comments, or for technical assistance regarding this web site.