http://ecosystems.mbl.edu/tide<![if !supportNestedAnchors]><![endif]>
Acceptance and utilization of TIDE project data requires that:
· The Project Principal Investigator, Linda Deegan, be sent a notice stating reasons for acquiring any data and a description of the publication intentions.
· The Project PI and the Principal Investigator of the data set be sent a copy of the report or manuscript prior to submission and be adequately cited in any resultant publications.
· A copy of any resultant publications should be sent to:
Linda Deegan
Ecosystems Center
Marine Biological Laboratory
Woods Hole, MA 02543
TIDE PROJECT DATABASE
DATA FILE: LD-SW-Water level POA-2004.xls
LD-SW-Water level POA-2004.txt
DOCUMENTATION FILE: LD-SW-Water level POA-2004.doc
YEAR: 2004
PI: Linda Deegan
OTHERS: Christian Picard, Mike Johnson
BRIEF DESCRIPTION OF DATA FILE: Record of water depth at point of addition for Sweeney Creek and Ismatec pump output of fertilizer solution
KEYWORDS: POA, water, depth, pump, output, fertilizer
RESEARCH LOCATION:
|
Creek |
Branch |
Transect |
Habitat |
|
SW |
POA |
|
Creek |
EXPERIMENTAL DESIGN AND METHODS:
NOTES AND COMMENTS:
VARIABLE DESCRIPTION:
|
Name |
Description |
Unit |
Precision |
|
Year |
|
yyyy |
|
|
Month |
|
|
|
|
Day |
Day of
month |
|
|
|
Julian
Date |
Julian
Calendar Date |
|
|
|
Time |
24 hour
clock time |
|
|
|
Batt Volt |
Battery
voltsge power level |
Volts |
.01 V |
|
mV |
CV04
power control for pump |
molts |
1 mvolts |
|
mA |
Control
voltage for pump |
mAmps |
.001
mAmps |
|
Pump
outout |
Volume of
fertilizer pumped |
mL/sec |
1 mL |
|
Depth |
Depth of
water at POA |
Meters |
.01 |
CALCULATIONS: Control Voltage = ((CV04 output)+5000))/1000
Pump output = ((Control voltage)*(875.79))-56.354
FOR MORE INFORMATION, CONTACT: Christian Picard, Mike Johnson
OTHER DATA FILES TO REFERENCE:
REFERENCE CITATIONS:
ARCHIVE INFORMATION:
Date of entry: 2/8/06
Data entered by: Mike Johnson
Comments: