http://ecosystems.mbl.edu/tide<![if !supportNestedAnchors]><![endif]>
Acceptance and utilization of TIDE project data requires that:
· The
Project Principal Investigator,
· The Project PI and the Principal Investigator of the data set be sent a copy of the report or manuscript prior to submission and be adequately cited in any resultant publications.
·
A copy of any resultant publications should be sent to:
Marine Biological Laboratory
Woods
TIDE PROJECT DATABASE
DATA FILE: LD-CL-Water level-2005.xls
DOCUMENTATION FILE: LD-CL-Waterlevel-2005.doc
YEAR: 2005
PI: Linda Deegan
OTHERS: Christian Picard, Mike Johnson
BRIEF DESCRIPTION OF DATA FILE: Record of water depth at point of addition for Sweeney Creek and Ismatec pump output of fertilizer solution
KEYWORDS: POA, water, depth, pump, output, fertilizer
RESEARCH LOCATION:
|
Creek |
Branch |
Transect |
Habitat |
|
|
|
|
|
EXPERIMENTAL DESIGN AND METHODS:
NOTES AND COMMENTS:
VARIABLE DESCRIPTION:
|
Name |
Description |
Unit |
Precision |
|
|
|
|
|
|
|
|
|
|
|
|
Day of
month |
|
|
|
|
Julian
Calendar Date |
|
|
|
|
24 hour
clock time |
|
|
|
|
Battery
voltsge power level |
Volts |
.01 V |
|
|
CV04 power
control for pump |
mAmps |
.001
mAmps |
|
|
Control
voltage for pump |
Volts |
.01 V |
|
|
Volume of
fertilizer pumped |
mL/min |
1 mL |
CALCULATIONS: Control Voltage = ((CV04 output)+5000))/1000
Pump output = ((Control voltage)*(875.79))-56.354
FOR MORE INFORMATION, CONTACT: Christian Picard, Mike Johnson
OTHER DATA FILES TO REFERENCE:
REFERENCE CITATIONS:
ARCHIVE INFORMATION:
Date of entry: 2/8/06
Data entered by: Mike Johnson
Comments: